9 Jan 2017

Stainless Steel Ductwork- Large Waste Site
Back to News Page

Project size – 1 million

A large construction company were in urgent need of assistance when their existing subcontractor failed to meet the deadlines and quality requirements of a large ductwork job. They needed large, high integrity ductwork on site within the month and the project finished in less than 12 weeks

 

Manufacture and delivery of Fully TIG welded Circular stainless steel ductwork in diameters from 300 (pipework) to 2.5 mtrs

  • Nuclear Specification level 4
  • Thickness range from 2-6 mm
  • SMACNA High pressure ductwork
  • Manufactured to Interserve Pipework spec
  • Welders all qualified to BSEN ISO 9606-1:2013

 

Project Highlights

Short lead time for large job

Extremely High Specification

Die penetration tested to achieve highest quality finish

 

Related Articles

7 ductwork design mistakes to avoid
Sheet Metal Fabrication
Read More
What is a TIG weld?
Welding
Read More
What is MIG welding?
Welding
Read More