Project size – 1 million

A large construction company were in urgent need of assistance when their existing subcontractor failed to meet the deadlines and quality requirements of a large ductwork job. They needed large, high integrity ductwork on site within the month and the project finished in less than 12 weeks

Stainless Steel Ductwork

Manufacture and delivery of Fully TIG welded Circular stainless steel ductwork in diameters from 300 (pipework) to 2.5 mtrs

  • Nuclear Specification level 4
  • Thickness range from 2-6 mm
  • SMACNA High pressure ductwork
  • Manufactured to Interserve Pipework spec
  • Welders all qualified to BSEN ISO 9606-1:2013
Stainless Steel Bend

Project Highlights

Short lead time for large job

Extremely High Specification

Die penetration tested to achieve highest quality finish